Subdivisions
Elerson Trace Park
30 lots – Residential
Project Status: Site Grading Commenced (10/17)
Construction 5% Complete, installing sewer (11/17)
Construction 10% Complete, installing sewer (12/17)
Construction 60% Complete, paving being installed (1/18)
Construction 70% Complete, paving and drainage being installed (2/18)
Construction 80% Complete, paving and drainage being installed (3/18)
Developer: Wildwood Development Company I, L.P.
Engineer: Crannell, Crannel & Martin
Contractor: Wildwood Development Company I, L.P.
The Homestead at Daniel Farm - Phase 1A
68 lots – Residential
Project Status: Design Review (10/17)
Design Review (11/17)
Design Review Complete (12/17)
Design Review Complete, Awaiting Pre-Construction Meeting (1/18)
Design Review Complete, Awaiting Pre-Construction Meeting (2/18)
Pre-Construction Meeting Scheduled for April 11, 2018 (3/18)
Developer: Wildwood Development Company I, L.P.
Engineer: Dietz Engineering
Contractor: TBD
Summit Parks Phase 2
72 lots – Residential
Project Status: Design Review (11/17)
Design Review (12/17)
Design Review (1/18)
Design Review (2/18)
Design Review Complete Awaiting Pre-Construction Meeting (3/18)
Developer: Alluvium Development
Engineer: Bannister Engineering
Contractor: TBD
Hidden Lakes Phase 1
40 lots – Residential
Project Status: Design Review (12/17)
Design Review (1/18)
Design Review (2/18)
Design Review (3/18)
Developer: Alluvium Development
Engineer: Bannister Engineering
Contractor: TBD
Hidden Lakes Phase 2
31 lots – Residential
Project Status: Design Review (12/17)
Design Review (1/18)
Design Review (2/18)
Design Review (3/18)
Developer: Alluvium Development
Engineer: Bannister Engineering
Contractor: TBD
Cole Crossing Estates
66 lots – Residential
Project Status: Design Review (3/18)
Developer: Harlan Properties
Engineer: Land Design
Contractor: TBD
Trees Farm Phase I
101 lots – Residential
Project Status: Design Review (3/18)
Developer: Bloomfield Homes, LLP
Engineer: Engineering Concepts & Design, LLP
Contractor: TBD
Parkerville Meadows Phase 3
112 lots – Residential
Project Status: Design Review (3/18)
Developer: Kapsen Development Group, LLC
Engineer: Atlas Associates, Inc.
Contractor: TBD