Subdivisions

Elerson Trace Park  
30 lots – Residential
Project Status:  
Site Grading Commenced (10/17)
                           Construction 5% Complete, installing sewer (11/17)
                           Construction 10% Complete, installing sewer (12/17)
                           Construction 60% Complete, paving being installed (1/18)
                           Construction 70% Complete, paving  and drainage being installed (2/18)
                           Construction 80% Complete, paving  and drainage being installed (3/18)
Developer: Wildwood Development Company I, L.P. 

Engineer: Crannell, Crannel & Martin
Contractor: Wildwood Development Company I, L.P.

The Homestead at Daniel Farm - Phase 1A 
68 lots – Residential
Project Status:  Design Review (10/17)
                           Design Review (11/17)
                           Design Review Complete (12/17)
                           Design Review Complete, Awaiting Pre-Construction Meeting (1/18)
                           Design Review Complete, Awaiting Pre-Construction Meeting (2/18)
                           Pre-Construction Meeting Scheduled for April 11, 2018 (3/18)
Developer: Wildwood Development Company I, L.P.

Engineer: Dietz Engineering
Contractor: TBD

Summit Parks Phase 2 
72 lots – Residential
Project Status: Design Review (11/17)
                          Design Review (12/17)
                          Design Review (1/18)
                          Design Review (2/18)
                          Design Review Complete Awaiting Pre-Construction Meeting (3/18)
Developer: Alluvium Development

Engineer: Bannister Engineering
Contractor: TBD

Hidden Lakes Phase 1 
40 lots – Residential
Project Status: Design Review (12/17)
                           Design Review (1/18)
                           Design Review (2/18)
                           Design Review (3/18)
Developer: Alluvium Development

Engineer: Bannister Engineering
Contractor: TBD

Hidden Lakes Phase 2 
31 lots – Residential
Project Status: Design Review (12/17)
                           Design Review (1/18)
                           Design Review (2/18)
                           Design Review (3/18)
Developer: Alluvium Development

Engineer: Bannister Engineering
Contractor: TBD

Cole Crossing Estates 
66 lots – Residential
Project Status: Design Review (3/18)
Developer: Harlan Properties

Engineer: Land Design
Contractor: TBD

Trees Farm Phase I 
101 lots – Residential
Project Status: Design Review (3/18)
Developer: Bloomfield Homes, LLP

Engineer: Engineering Concepts & Design, LLP
Contractor: TBD


Parkerville Meadows Phase 3
 
112 lots – Residential
Project Status: Design Review (3/18)
Developer: Kapsen Development Group, LLC

Engineer: Atlas Associates, Inc.
Contractor: TBD