Capital Improvement Projects (CIP)

Projects Updated Quarterly

Project Name: Danieldale Road
Project Location/Limits: West city limits to Westmoreland Road
Project Type: Street Widening
Project Description: Widen roadway to 4 concrete lanes (2 lanes per direction separated by raised median). Includes drainage improvements, permanent traffic signal at Bolton Boone intersection, trail, landscape and street lighting
Project Status: Design is 60% complete
Last Update: July 2022
City Contact: Elizabeth Quilici

Project Name: Cove Meadow / Lake Grove Erosion Mitigation
Project Location/Limits: 1312/1316 Lake Grove Lane and 907 Cove Meadow Circle
Project Type: Drainage
Project Description: Mitigate erosion, restore channel and sewer relocation
Project Status: Construction to begin Fall 2022
Last Update: July 2022
City Contact: Soon Wong

Project Name: Chattey Road
Project Location/Limits: Belt Line Road to Pleasant Run Road
Project Type: Street Reconstruction
Project Description: Replace existing asphalt pavement with concrete pavement. Includes drainage improvements, traffic calming elements, water line replacement, sewer line replacement, sidewalks, landscape and street lighting. Remaining items to be installed are the street lights.
Project Status: Construction is 99% complete
Last Update: July 2022
City Contact: MD Hossain

Project Name: 2021 Alley Reconstruction
Project Location/Limits: Belclaire Terrace, Briarbrook, Live Oak, Oak Meadow and Westlake Dr.
Project Type: Alley
Project Description: Remove and reconstruct alley pavement
Project Status: Construction to begin Fall 2022
Last Update: July 2022
City Contact: Soon Wong

Project Name: 2021 Renovation and Replacement Phase I
Project Location/Limits: Greenbrook Drive, Shadybrook Drive, Briarbrook Drive, Adams Pl. Cassandra Cir., Shadybrook Cir.
Project Type: Water and Sewer Replacements
Project Description: Replace water and sewer lines and reconstruct pavement
Project Status: Contract Awarded to No-DigTech, Project projected start in September 2022 
Last Update: July 2022
City Contact: Soon Wong

Project Name: 2021 Renovation and Replacement Phase 2
Project Location/Limits: Greenbrook Drive, Shadybrook Drive, Briarbrook Drive, Adams Pl. Cassandra Cir., Shadybrook Cir.
Project Type: Street Reconstruction
Project Description: Reconstruct asphalt pavement
Project Status: Construction to begin when Phase I is 50% complete
Last Update: July 2022
City Contact: Soon Wong

Project Name: 2020 Street Reconstruction
Project Location/Limits: Old Hickory Trail, Keysville Avenue, Stinnett Place, Reedsport Place, Silver Creek Dr.
Project Type: Street Reconstruction
Project Description: Reconstruct asphalt pavement
Project Status: Construction slated to start Fall 2022
Last Update: July 2022
City Contact: Soon Wong

Project Name: Westmoreland Road
Project Location/Limits: Parkerville Road to Belt Line Road
Project Type: Street Expansion
Project Description: Widen roadway to 4 concrete lanes (2 lanes per direction separated by raised median). Includes drainage improvements, water line replacement, traffic signal at Eagle and Parkerville intersections, sidewalks, trailhead, landscaping and street lighting
Project Status: Design 95% complete. Construction anticipated to start Summer 2023
Last Update: July 2022
City Contact: MD Hossain

Project Name: Pleasant Run Road
Project Location/Limits: Cockrell Hill Road to Westmoreland Road
Project Type: Street Expansion
Project Description: Widen roadway to 4 concrete lanes (2 lanes per direction separated by raised median). Includes drainage improvements, water line replacement, sewer line replacement, sidewalks, landscaping and street lighting
Project Status: Design 100% Complete - Franchise Utility relocations started. Construction anticipated to start in Fall of 2023
Last Update: July 2022
City Contact: MD Hossain

Project Name: Hampton Road Corridor Redevelopment
Project Location/Limits: Belt Line Road to Pleasant Run Road
Project Type: Corridor Redevelopment
Project Description: On Hampton Rd., between Belt Line and Pleasant Run, is broken into a 3-lane segment roadway from Pleasant Run Road to Heath Creek with buffered bike lanes, on-street parking, and a pedestrian plaza and a 2-lane segment from Heath Creek to Beltline Road with buffered bike lanes, a landscaped median, and a pedestrian plaza. This plan is intended to create a walkable viable, complete street that is safe, pedestrian friendly, and a destination for DeSoto and the surrounding communities.
Project Status: Design 5% Complete
Last Update: July 2022
City Contact: Elizabeth Quilici

Project Name: 2021 Street Reconstruction
Project Location/Limits: Wintergreen Rd. (Westmoreland Rd. to Ten Creek Mile Creek Bridge); UHL Rd. (Parkerville Rd. to S. City Limits); Parkerville Rd. (Westmoreland Rd. to Hampton Rd.); The Meadows Parkway
Project Type: Street Reconstruction
Project Description: Reconstruct or rehabilitate asphalt pavement
Project Status: Design Complete - Construction Contract to be awarded in Fall 2022
Last Update: July 2022
City Contact: Soon Wong

Project Name: 2023 Alley Reconstruction
Project Location/Limits: Oak Meadows Ln., Woodbrook Dr., Glen Ave., Pine Tree/Shadywood, Hillside/Crestwood Cloudcrest/Blue Sky and Stardust/Blue Sky
Project Type: Alley
Project Description: Remove and reconstruct alley pavement
Project Status: Design 
Last Update: July 2022
City Contact: Soon Wong

Project Name: Shoreline Dr. Drainage
Project Location/Limits: Shoreline Dr. and Beltwoods Dr.
Project Type: Drainage
Project Description: Drainage Infrastructure replacement and shoring of failing support, Install Gabions and anchors. 
Project Status: Design 60% complete
Last Update: July 2022
City Contact: MD Hossain

Project Name: Methodist Care Center Erosion Control Project
Project Location/Limits: 109 Methodist Way
Project Type: Drainage
Project Description: Sanitary Sewer line shoring of bank erosion 
Project Status: Design 30% complete
Last Update: July 2022
City Contact: MD Hossain

Project Name: Hampton Rd. Booster Pump Station
Project Location/Limits: 120 W. Centre Park Blvd.
Project Type: Pump Station Renovation
Project Description: Upgrade existing facility 
Project Status: Design Complete
Last Update: July 2022
City Contact: MD Hossain

Project Name: Fire Station #3 Renovations
Project Location/Limits: Cockrell Hill Rd. and Pleasant Run Rd. Intersection
Project Type: Full Renovation
Project Description: Upgrade existing station to current standards
Project Status: Design 70% complete. Anticipated construction to begin Spring 2022
Last Update: July 2022
City Contact: MD Hossain

Project Name: Curtistene S. McCowan Park - Recreation and Aquatic Facility
Project Location/Limits: UHL Road
Project Type: Expansion and Remodeling
Project Description: Feasibility Study has been completed. Design Architect hired. 
Project Status: Natatorium and Recreation Center
Last Update: July 2022
City Contact: Elizabeth Quilici