Future Projects

Chattey Rd. - Pleasant Run Rd. to Belt Line Rd. Improvements
Engineer: EJES, Inc.
Contractor: TBD
Project: Chattey Road is an existing two-lane asphalt roadway located within a residential community. The improved roadway will be a 27’ undivided concrete roadway with curb and gutter, closed drainage, sidewalks, retaining walls, sewer line crossings, water line replacement, landscaping and lighting.
Project Status:  Atmos Energy gas line relocates ongoing (7/19)

                              Atmos Energy gas line relocates ongoing (8/19)
                              Atmos Energy gas line relocates ongoing (9/19)
Construction anticipated to begin Fall 2019
   
Pleasant Run Rd. - Joint MCIP Project # 1- Dallas County
Engineer: Garver
Contractor: TBD
• Project:  Pleasant Run Rd. (Westmoreland Rd. – Cockrell Hill Rd.), 2 lane concrete roadway w/curb and gutter and storm drain. 
Project Status: 
Preliminary design ongoing (7/19)
                             Preliminary design ongoing (8/19)
                             Preliminary design ongoing (9/19)

Construction anticipated to begin Summer 2020
 

Westmoreland Rd. - Joint MCIP Project # 2 - Dallas County
Engineer: Freese and Nichols
Contractor: TBD
• Project:  Westmoreland Rd. (Belt Line Rd. – Parkerville Rd.), 2 lane concrete roadway w/curb and gutter and storm drain. 
Project Status: Preliminary design ongoing (7/19)
                             Preliminary design ongoing (8/19)
                             Preliminary design ongoing (9/19)

Construction anticipated to begin Winter 2020
      
Whispering Oaks Drainage
* Engineer: Dallas County
* Contractor: TBD
* Project:
Protect city outfall structure from falling into the creek.
Project Status:  Final design in progress (7/19)
                              Final design in progress (8/19)
                              Final design in progress (9/19)
Construction anticipated to begin Spring 2020